Community Development
arrow Community Development
  • Building Permits
  • Brochures
  • Zoning Regulations
  • Good Neighbor Ordinances
  • Village Flood Info
  • Storm Water Management
  • District Map
  • Property Maintenance Request Form
  • arrow New Construction
    arrow Applications Procedures & Forms
    arrow Contractor Information
  • Contractor License App.
  • Owner/Contractor Insruct.
  • Subcontractors
  • arrow Plan Commission
  • General Information
  • Proc. for Filing Apps.
  • arrow Revitalization & Redevelopment Committee
  • Demographic Information
  • Shopping Center List
  • Industrial Park List
  • New Business Information
  • ResourceCenter
    » Police Auction
    » E-NEWS Subscription
    » Forms & Applications
    » Download Newsletter
    » Download Recreation Guide
    » Web Site Map
    » Photo Gallery
    » Back to Community Dev.
    » Return to HOMEPAGE

    SEARCH

    print icon
    email icon


     
     

     

    Instructions

    The inspection card shall be posted in a conspicuous place in such a position as to allow the inspector to conveniently make entries thereon.

    The owner, contractor, or his agent shall make requests to the Community Development Department a minimum of twenty-four (24) hours before inspections are desired.

    1. Footings: After forms are erected or trenches are excavated and before the placing of concrete. Soil tests shall be made and the results filed with the Community Development Department of the ultimate bearing strata for foundation footings.

    2. Before Placing Lumber: Submit a spot survey for approval showing (1) elevation of Top of Foundation, (2) location of foundation with ties to front and side lot lines, (3) accurate dimensions of foundations.

    3. Foundations: After dampproofing and drain tile is in place and before backfilling.

    4. Sheathing: Before any exterior covering is installed.

    5. Plumbing - Rough: During test application and before covering or concealing.

    6. Electrical Service and Roughed-In Electrical: Before covering or concealment and before insulation is installed, and prior to any wires being pulled.

    7. Framing: After plumbing, mechanical and electrical are roughed in and before covering, concealment or any insulation is installed.

    8. Driveway, Patios, Service Walks and Concrete Work: After forms are erected and before placing of any materials.

    9. Water and Sewer Service Lines: When in place and before backfilling.

    10. Final Inspection: Must be requested four (4) working days before occupancy is desired.

    To obtain a Certificate of Occupancy:

    • Water meter must be installed and approved.
    • Submit Village Engineer's approval letter of Record Drawing and Alta Survey.

    Village working hours are Monday thru Friday, 8:00 A.M. - 4:30 P.M. Please schedule inspections with Debbie or Sue at 630.260.6030.

    Plan Review Fees
    Single Family House
    $115.00
    Multi-Family Residential
    $150.00
    Commercial, Industrial & Other
    Percent of Estimate of Cost
    0-10,000 sq. ft
    10%
    10,001 - 30,000 sq. ft
    7%
    30,001 - 100,000 sq. ft
    3%
    100,001 - 150,000 sq. ft
    2%
    Over 150,000 sq. ft
    1%

    Site Improvement Fees

    Estimate of cost site improvement
    Fee
    0 - $1,000
    $100.00
    $1,001 - 5,000
    $200.00
    $5,001 - 10,000
    $300.00
    $10,001 - 50,000
    $400.00
    Over $50,000
    1% of Estimate of Cost

    Plan Review and Site Improvement Fees must be paid at the time of filing an application for a building permit.

     